Posted on / by admin / in Energy Monitoring System, Power, SCADA

Plant Wide Electrical and Utility Monitoring System for Steel Plant

Plant Wide Electrical and Utility Monitoring System for Steel Plant

Customer Requirement

  • Real-time monitoring of electrical and utility energy generation and consumption
  • Integration of 20+ existing third party L1 systems over various protocol using existing network
  • Redundant central SCADA system with historian, operator stations and web clients
  • IT & networking hardware
  • UPS system
  • Fiber optic and Ethernet cabling

Systems and Tools

  • Redundant Citect SCADA system with historian, operator client, web clients
  • IT includes servers, PC, 50″ large display, printer etc. & networking hardware (Ethernet switches and hardware firewall etc.) and cables

Project Scope

  • Supply, basic and detail engineering, design and development, procurement, inspection, dispatch, installation and commissioning, performance test, training,  as-built documentation and hand-over
We’d love to hear from you to discuss Automation Process, Services, Training or to hear your new idea.