Customer Requirement
- Disturbance fault recording system for 500MW generator & 400KV transmission lines fault analysis
- When any generator & line is tripped, to find the cause and to fill RCA report i.e. Root cause analysis report
- Need information – At what time fault occurred, status of digital channels, status of analog channels, condition of generator/lines etc.
- Monitoring of system protection performance
- Recording of system events
- The vital evidence that tells what happened during the fault is found in the pre-trigger, event duration, and post fault information of the captured record.
Systems and Tools
- Disturbance fault recording system
- Configuration & fault analysis software
- Communication cables & related accessories
Project Scope
- Supply of disturbance fault recording with configuration software and communication cables
- Commissioning of supplied system